Well, we've been very busy with work and projects, so this is just a quick update.

Boom Gallows:
The original boom gallows cross beam was laminated, and badly needed some attention (varnish, fix delaminating spots, etc.). We took this off, spent about a week of evenings sanding it, then decided the extent of the delamination was such that we would need to pull it completely apart and relaminate it....well...we pulled it apart without too much trouble...

Plan B: replace with a solid piece of wood. Quick trip to MacBeath's revealed that the price of a piece of teak sufficient to do the job would roughly equal the cost of a new sail, so mahogany it is!

The other funny thing about this is that the bronze brackets which hold the boom gallows are exactly 2" across. Now, if you've ever bought lumber you'll know that an 8/4 piece of wood (rough sawn to 2") is only 1 3/4" when planed down. So we would have to find a thicker piece, and plane it down significantly just to get the extra 1/4" of thickness. Instead of doing this we went with an 8/4 piece and have come up with a plan to use small pieces of teak as trim on the gallows. I think it's going to look really nice, we'll varnish the mahogany and leave the teak natural. We'll post photos as soon as possible (which may be a while because...)

Repower:
Next week we're repowering. We've mapped out the electrical system, have a rough plan on how we're going to cut away the necessary cabinetry, and we've got a few days off from work. It's going to be quite a process, and it will probably be all quiet on the blog front until we've come out the other end.